Short answer: Maximum tolerable downtime (MTD) is how long a business process can be disrupted before the harm becomes unacceptable. It is a business decision. The recovery time objective (RTO) is how long the systems behind that process can take to recover, and it must be shorter than the MTD. The recovery point objective (RPO) is how far back in time you can afford to lose data, and it sets how often you back up or replicate.

These three numbers drive most of the cost of a disaster recovery design, so it pays to get them right before buying anything. Set them too loose and the plan fails the business. Set them too tight and you pay for recovery speed nobody needed.

The three terms

NIST SP 800-34, the US federal contingency planning guide, defines all three. The table puts its definitions next to who owns each number and what it drives.

Term NIST definition (SP 800-34 Rev. 1) Who sets it What it drives
MTD “The amount of time mission/business process can be disrupted without causing significant harm to the organization’s mission” (glossary) The business owner of the process The upper limit for every recovery target below it
RTO “The overall length of time an information system’s components can be in the recovery phase before negatively impacting the organization’s mission or mission/business processes” (glossary) IT, within the limit set by the MTD Recovery architecture: standby sites, failover, staffing
RPO “The point in time to which data must be recovered after an outage” (glossary) The business owner, with IT advising on cost Backup frequency and replication design

MTD describes a business process, such as taking orders. RTO and RPO describe the systems that support it. One process can depend on several systems, and each needs targets that fit inside the process’s MTD.

A worked example

Take a hypothetical online order system. The sales director agrees that losing orders for more than 8 hours would do serious harm, so the MTD is 8 hours.

The RTO cannot simply be 8 hours. Recovery time is not only the restore itself. Somebody has to notice the outage, decide to invoke the recovery plan and then check that the restored system works. If detection and the decision take up to 1 hour and validation takes 1 hour, a 4-hour restore gives a total of 6 hours, leaving 2 hours of margin inside the MTD.

The book defines the RTO as the maximum time before the service must be back in operation, which counts the whole 6 hours. NIST’s definition counts only the time spent in the recovery phase, which here is the 4-hour restore. Both uses are common, so write down which one your targets mean. If you use the end-to-end figure, the RTO is 6 hours and the restore has a 4-hour budget inside it.

Now the RPO. If the order database is backed up once a night at 01:00 and fails at 23:00 the same day, the newest backup is 22 hours old. Every order taken in those 22 hours is gone unless it can be rebuilt from somewhere else. If the business says it can lose at most 15 minutes of orders, nightly backups cannot meet that. You need replication or log backups at least every 15 minutes, and that decision has a price the business should see.

How to get honest numbers from the business

Ask a business leader how much downtime they can tolerate and the answer is usually “none”. Chapter 12 of Modern IT Infrastructure and Operations suggests a better question: what is the financial impact of being down for 4 hours compared with 24 hours? Moving the conversation from tolerance to cost makes people rank their systems, because they can see that a near-zero RTO is a spending decision.

A short business impact analysis then records the answers. The book gives a sample matrix along these lines:

Function MTD RTO RPO Owner
Email and communication 8 hours 2 hours 15 minutes IT operations
ERP and finance 24 hours 4 hours 30 minutes Finance IT lead
CRM 48 hours 6 hours 1 hour Sales director
Data warehouse 72 hours 8 hours 4 hours Data team

Every RTO in the sample is well inside its MTD, and every row has a named owner. Both are worth copying. A target without an owner is a guess.

Matching the RTO to a recovery option

The RTO narrows the choice of recovery design. The book describes the usual options this way:

  • Cold site: basic facilities but no IT equipment in place. Lowest cost, recovery in days or weeks.
  • Warm site: some infrastructure in place and data already replicating. Recovery typically in hours.
  • Hot site: a running copy of the environment with live replication. Highest cost, recovery sometimes in minutes.
  • Cloud recovery: capacity provisioned when needed. Lower standing cost, but recovery speed depends on provisioning time and how fast data can be moved.

A 4-hour RTO rules out a cold site. A 15-minute RTO usually rules out anything that needs a person to start the restore by hand.

Common mistakes

  • An RTO equal to or longer than the MTD. The book puts it plainly: such a plan is designed to fail its own business requirement.
  • An RPO nobody compared with the backup schedule. Check the actual schedule and the last successful job, not the policy document.
  • Forgetting shared dependencies. An application restored in 2 hours is still down if identity, DNS or the network it needs takes 6.
  • Targets that were never tested. Record the RTO and RPO actually achieved in each recovery test next to the targets. The gap is the real risk.
  • Every system in the top tier. If everything has a 1-hour RTO, the budget is either huge or the targets are not real.

Templates and further reading

The Disaster Recovery Plan Template has sections for recovery objectives by tier, roles, invoking the plan, recovery order, a runbook for each system, failback and testing. The business impact analysis summary sits in the Business Continuity Plan in the same toolkit. To put a cost on downtime before you agree the targets, use the Downtime Cost Calculator. Both are in the Resilience and DR Toolkit along with tabletop exercise scenarios and a DR readiness assessment.

Chapter 12 of Modern IT Infrastructure and Operations covers business continuity, disaster recovery and resilience planning in depth. For converting availability targets into minutes of downtime, see 99.9% vs 99.99% availability. For one practical lesson a week, join the newsletter.

Sources: NIST SP 800-34 Rev. 1 definitions via the NIST glossary (MTD, RTO, RPO). Al Alousi, Modern IT Infrastructure and Operations, chapter 12. The order system is a hypothetical example.

Before you download

These templates are general starting points, not legal, compliance, financial or other professional advice. They are not tailored to your organization.

You are responsible for adapting, checking and approving anything you use. The files are provided as is, without warranty, and 365 Technical LLC is not liable for how they are used.

By downloading, you agree to the Terms of use (opens in a new tab).