Short answer: Hold a post-incident review after every major incident and after any incident that crosses a trigger you agreed in advance, such as user-visible downtime past a set length or any data loss. Build the timeline before the meeting, spend the meeting on how the system let the failure happen rather than on who made the mistake, and end with a short list of actions that each have one owner and a due date. The review is only finished when those actions are closed.
Many teams write something after a bad outage. The trouble is what happens next. The document gets filed, the meeting ends with “we need to be more careful”, and three months later the same failure comes back with a different ticket number. A good post-incident review (PIR, also called a postmortem) is a small, repeatable process that turns one painful night into a lasting fix.
A PIR is a structured look at a significant incident: what happened, why it happened, how well the response worked, and what will change so it does not happen again. Google’s Site Reliability Engineering book treats the postmortem as the written account of an incident: how bad it was, how it was handled, why it happened and what will be done next.
The record is not the point. The glossary of Modern IT Infrastructure and Operations puts it plainly: the value of a PIR lies in the corrective actions it produces, not in the document. Keep that in mind at every step below.
If you decide case by case, reviews happen after the incidents that embarrassed someone senior and get skipped for the quieter ones that teach more. Agree the triggers in advance and write them into your incident process. The list below is adapted from the common triggers in Google’s SRE book, with one addition for teams that use priority levels.
| Trigger | What to define for your team |
|---|---|
| Users saw downtime or degraded service | A threshold, for example any outage of a critical service longer than a set number of minutes |
| Any data was lost | No threshold; any data loss counts |
| On-call had to intervene by hand | Which actions count, such as rolling back a release or rerouting traffic |
| Resolution took too long | A time limit per priority level, usually tied to your restore targets |
| Monitoring missed it | Any incident a person discovered before an alert did |
| The incident was P1 or a declared major incident | Always review, whatever the other criteria say |
Also let anyone involved request a review. Chapter 11 of the book lists post-incident reviews for major incidents as an incident management best practice; the triggers above extend that to the smaller incidents that warn you about the next big one.
Blameless does not mean nobody is accountable. It means the review looks for the conditions that made the failure possible, and assumes the people involved acted in good faith on the information they had at the time. Google’s SRE book makes the same point: the review names contributing causes and leaves individuals and teams out of the verdict.
There is a practical reason for this. If people expect to be blamed, they stop telling you what really happened, and the timeline fills with gaps exactly where you need detail. Chapter 3 of the book names late escalation out of fear of blame as a common culture failure on IT teams.
The test is what you write in the “cause” field. Chapter 11 of the book warns against ever accepting “human error” as a root cause: if one mistyped command can take down production, the cause is the design that let a single typo do that. Replace the person and the next one will make the same mistake. Some hypothetical examples of the shift in language:
| Blame wording | Blameless wording |
|---|---|
| The engineer ran the script against the wrong server. | The production and test hosts had near-identical names, and the script did not confirm the target before running. |
| The on-call engineer ignored the alert. | The alert fired many times a week without action needed, so it was not treated as urgent. |
| The change was not tested properly. | The change process did not require a test result before approval for this type of change. |
| Nobody told the service desk. | The communication plan did not name who updates the service desk during an incident. |
Notice that every blameless version points to something you can change: a naming convention, an alert threshold, a process rule, a role.
Name one facilitator who was not leading the incident. Ask them to collect chat logs, ticket notes, alerts and change records, and to draft a timeline with timestamps: first sign of trouble, first alert, first human response, key decisions, mitigation, full recovery. Share it in advance so people can correct it. Building the timeline in the meeting wastes most of the hour.
Hold the review within a few working days, while memories are fresh but after people have slept.
Invite the people who responded, the service owner, and someone from any team that was affected. A one-hour meeting is enough for most incidents. One way to split the time (an example to adapt, not a rule):
Questions that tend to surface real causes: What did we expect to happen, and what happened instead? What made this hard to detect or diagnose? Which safeguards worked, and which did not? Had we seen warning signs before, and what happened to them? Did the people involved have the access and information they needed? What would have made the impact smaller or shorter?
Look for several contributing factors rather than one root cause. Real incidents often involve several factors at once, such as a monitoring gap, a risky change and a missing check. For a deeper dig into one factor, the techniques chapter 11 of the book describes for problem management (the 5 Whys, fishbone diagrams and fault tree analysis) all work here. Apply the 5 Whys to each factor separately rather than as the whole analysis, or it will push you toward a single chain and a single cause.
Keep the record short enough that people will read it: a summary, the business impact, the timeline, how the incident was detected and handled, the contributing factors, what went well, and the actions. Name roles (“the on-call engineer”, “the change approver”), not people. Where the review finds an underlying cause that needs longer investigation, open a problem record and link it, so the work moves into problem management instead of dying with the meeting.
This is where many reviews fail. Chapter 3 of the book lists “post-incident actions are never closed” as a culture failure, and recommends tracking them to closure rather than just discussing them. A few rules help:
A useful health check: count how many incidents in the last quarter repeated a cause that an earlier review had already found. If that number is not falling, your reviews are producing documents, not change.
The Incident Management Toolkit includes a Post-Incident Review Pack with ground rules, a review record, a 60-minute meeting agenda and an action tracker, alongside a major incident runbook, a severity matrix and communication templates. To log incidents and see which ones should trigger a review, start with the free IT incident log.
Chapter 11 of Modern IT Infrastructure and Operations covers incident, problem and change management, including a root cause analysis template for problem records. If your reviews keep arguing about how serious an incident was, see the incident priority matrix guide.
Sources: Lunney and Lueder, “Postmortem Culture: Learning from Failure”, chapter 15 of Google, Site Reliability Engineering. Al Alousi, Modern IT Infrastructure and Operations, chapters 3 and 11 and the glossary. Example wording, timings and thresholds are illustrations to adapt, not a standard.
Short answer: Spend days 1 to 30 listening: a one-on-one with every person, meetings with your manager and the team’s main customers, and a close look at the current workload. Spend days 31 to 60 setting direction: agree priorities, set a regular rhythm and hand over the technical work you used to own. Spend days 61 to 90 leading one larger improvement and asking the team for feedback on you. The change that matters most is accepting that your output is now the team’s output.
Engineers usually get promoted because they are good at the work. The first months as a manager can feel like being worse at everything: fewer problems solved by you, more time in conversations whose results are slow to show. That feeling is normal, and a simple plan for the first 90 days helps you spend the time on the right things.
Chapter 2 of Effective IT Team Management names three shifts new managers have to make. You move from being the expert people turn to, to being the person who keeps the team’s work aligned with business goals. You have to delegate work you could do faster yourself. And you need skills the technical role rarely tested: communication, handling conflict and adapting to change.
The same chapter lists the pitfalls that follow from ignoring those shifts: micromanaging, overcommitting to technical tasks and not asking for the team’s feedback. Much of the plan below is designed to avoid them.
| Days | Focus | By the end you should have |
|---|---|---|
| 1 to 30 | Listen and learn | Notes from a one-on-one with every person, what your manager expects at day 90, a list of the team’s main problems and pending decisions |
| 31 to 60 | Set direction | Agreed priorities, a regular meeting rhythm, clear ownership, one or two quick improvements delivered, technical work handed over |
| 61 to 90 | Lead and improve | One larger improvement under way with an owner and a measure, feedback given to everyone, feedback received on you, a plan for the next quarter |
Resist the urge to fix things in week one. You do not yet know which problems are real, which are symptoms, and which already have a plan you have not heard about. Your job this month is to learn.
Useful questions for the first one-on-ones:
By day 30, you should be able to write down three things the team does well, the three problems mentioned most often, and the decisions that are waiting for you.
Now act on what you heard. Agree the team’s priorities with your manager and explain them to the team, including what you will say no to. Set up a rhythm and protect it: regular one-on-ones, a short weekly team meeting and a monthly look at results.
Pick one or two small improvements that several people asked for and deliver them quickly. It shows the listening was not for show.
This is also the time to hand over your old technical work. The book suggests a simple order: identify the tasks that can be delegated, match them to people based on skills and interests, and give them the training and resources they need. Then let them lead, with guidance, even when you would have done it differently. Delegate the outcome (“the backup restore test passes and is documented by Friday”), not every step.
If you were promoted from inside the team, say plainly in the first team meeting that the relationship has changed. Former peers usually handle the change better when it is named than when everyone pretends nothing is different.
You do not have to stop being technical. The book recommends a balance in the early stages rather than a clean break, and suggests blocking time for team planning separately from technical oversight. A good test: keep technical work that helps you understand the team’s problems (reviewing designs, joining a post-incident review), and give away work that only you are doing because you are fastest (being the first escalation for every outage).
The 90-Day New Manager Plan turns this guide into a checklist with space to record what you learn in each phase and a day-90 reflection. It is part of the IT Leadership and Team Management Toolkit, which includes a one-on-one meeting framework, a skills matrix and a team health survey. To see where your team depends on one person, read How to build a skills matrix for an IT team.
Chapter 2 of Effective IT Team Management is written for exactly this transition, with examples of delegation, mentorship and balancing technical and managerial work. For one practical lesson a week, join the newsletter.
Sources: Al Alousi, Effective IT Team Management, chapter 2. The plan structure follows the 365 Technical 90-Day New Manager Plan template.
Short answer: A service level agreement (SLA) is the promise to the customer, with consequences if it is missed. An operational level agreement (OLA) is a promise between internal teams that makes the SLA achievable. A service level objective (SLO) is a target value for something you measure, such as availability or response time. Build the SLA from SLOs you can measure, back it with OLAs that add up to less than the SLA, and keep internal targets tighter than the ones you publish.
Many IT teams have an SLA and nothing underneath it. The promise to the business says “P1 restored in 4 hours”, but nobody has agreed how fast the network team will join, or what the hardware vendor must deliver. When the promise is missed, every team met its own idea of good service. OLAs close that gap.
| Term | Between | What it contains | If it is missed |
|---|---|---|---|
| SLA | IT (or a provider) and its customer | Service scope, hours, targets, how they are measured, reporting, exclusions | Agreed consequences, such as service credits or a formal review |
| OLA | Internal teams within the provider | Each team’s responsibilities and internal targets, handoffs, escalation | Internal escalation and a fix to the process |
| SLO | Usually internal, sometimes published | One target for one measured indicator | A signal to act, not a penalty |
Google’s Site Reliability Engineering book draws the line between an SLA and an SLO by consequences: ask what happens if the objective is not met, and if there is no explicit consequence, you are almost certainly looking at an SLO (Service Level Objectives). The same book defines the indicator underneath, the SLI, as “a carefully defined quantitative measure of some aspect of the level of service that is provided.”
Agreements with outside suppliers that support your SLA are usually called underpinning contracts. They play the same role as OLAs, with a contract behind them.
Here is a hypothetical chain for a 4-hour P1 restore promise:
| Step | Owner | OLA target |
|---|---|---|
| Log, classify and assign the incident | Service desk | 5 minutes |
| Resolver acknowledges and starts work | Infrastructure on-call | 10 minutes after assignment |
| Diagnose and restore, including any vendor part | Infrastructure team and vendor | 2 hours 30 minutes |
| Total to restore | 2 hours 45 minutes |
The first two steps meet a 15-minute P1 response target, and the chain uses 2 hours 45 minutes of the 4 hours, leaving 1 hour 15 minutes of margin. Confirming with users and closing the ticket happen after the restore clock stops. If the steps added up to more than 4 hours, the SLA would be missed even when every team met its own target. If the hardware vendor’s contract allows 4 hours to arrive on site, the SLA cannot be 4 hours for incidents that need a part.
Chapter 8 of Effective IT Team Management lists the core steps: define the scope of service, set measurable metrics, agree the consequences of missing them, include how performance will be reported, and review the agreement regularly. In practice that means writing down:
The same chapter describes the OLA steps: identify which teams the SLA depends on, define each team’s responsibilities, and set internal metrics that line up with the SLA. Add the handoffs between teams, who to escalate to when a target is at risk, and contact details that are kept current. An OLA can be one page per supporting team.
The SRE book recommends keeping a tighter internal objective than the one you advertise, which gives room to fix problems before users notice. It also advises against choosing targets from current performance alone, and suggests starting with a looser target and tightening it later rather than promising something that has to be relaxed. If availability is part of the agreement, convert the percentage into minutes first. The availability downtime guide shows how small those allowances are.
An SLA written once and filed away stops matching the service within a year. Hold a short review on a fixed schedule, monthly for important services and quarterly for the rest, and cover the same points each time:
The SLA Template Library includes an SLA template, three example service schedules and an internal OLA. It is part of the Service Delivery Toolkit, which also has a service catalog template, a service performance dashboard and a service review meeting pack.
Chapter 8 of Effective IT Team Management covers SLAs and OLAs from the manager’s side, including how to structure both. Free templates for incident tracking and change requests are on the free resources page.
Sources: Google, Site Reliability Engineering, chapter 4, Service Level Objectives. Al Alousi, Effective IT Team Management, chapter 8. The OLA chain is a hypothetical example.
Short answer: List the skills your team must cover to run its services, rate each person on a short scale such as 0 to 3, and set how many people you need at a working level for each skill. The gaps and single points of failure then show up on one page. Use the matrix to plan cross-training, rotations and hiring, not to rank people.
Most teams know who the “go-to” person is for each system. The trouble starts when that person is on leave, on another incident or gone. A skills matrix makes that dependency visible before it causes an outage, and gives you a concrete plan for fixing it.
Start from the work, not from people’s CVs. Go through your services, runbooks, on-call duties and the changes you make most often, and list the skills needed to do them. Ten to twenty skills is usually right for one team. If the list runs to fifty, merge related items; nobody will keep a fifty-column matrix current.
Name skills by what someone can do, for example “restore a server from backup” or “change firewall rules safely”, rather than by product names alone. A product badge says what someone studied; a task says whether they can cover the work.
Long scales invite arguments about whether someone is a 6 or a 7. Four levels with clear definitions work better:
| Level | Meaning | Can cover the work alone? |
|---|---|---|
| 0 | No experience | No |
| 1 | Learning: has done it with help | No |
| 2 | Works independently, including when something goes wrong | Yes |
| 3 | Can teach others and handle unusual cases | Yes |
The line between 1 and 2 is the one that matters for cover. Chapter 1 of Modern IT Infrastructure and Operations makes the point well: a backup person is not a name in a spreadsheet, but someone who can carry out the work with minimal help. If that person cannot run the change or handle the incident, the role is still uncovered.
For each skill, decide how many people must be at level 2 or above. Base it on how the work is scheduled. For example, if a skill is needed on a weekly on-call rotation and you do not want anyone on call more than one week in four, you need at least four people who can handle it. For a skill used once a quarter, two may be enough, as long as they are not both on leave at the same time.
Self-ratings drift in both directions: confident people rate high, careful people rate low. Agree each rating in a one-to-one, using recent work as the evidence. “Have you done this without help in the last six months?” settles most cases quickly.
Here is a small hypothetical team of four, rated on five skills:
| Person | Networking | Backup and restore | Firewalls | Identity and access | Scripting |
|---|---|---|---|---|---|
| Person A | 3 | 2 | 1 | 2 | 1 |
| Person B | 2 | 0 | 0 | 1 | 3 |
| Person C | 1 | 3 | 2 | 2 | 0 |
| Person D | 2 | 1 | 0 | 1 | 2 |
| Needed at 2+ | 2 | 2 | 2 | 2 | 1 |
| People at 2+ | 3 | 2 | 1 | 2 | 2 |
| Result | OK | OK | Gap | OK | OK |
A few things stand out:
For each gap, pick a named person to move up a level, a named person to coach them, and a date. Chapter 6 of Effective IT Team Management starts the development plan the same way: identify the gaps for each person’s role and future work, then set goals and give them the resources to get there.
The fastest route from level 1 to level 2 is doing the work under supervision. The book on infrastructure and operations is direct about this too: cross-training has to include execution, because watching someone else creates false confidence. Have the learner run real changes and real recoveries with the expert beside them, then swap roles until the learner can do it alone.
When cross-training cannot close a gap in time, the matrix becomes the evidence for a hire or a contractor, which is much easier to argue for with a page showing one person covering a critical skill.
Download the free IT team skills matrix. It uses this 0 to 3 scale, counts coverage per skill and flags gaps in red. The paid IT Team Skills Matrix uses a five-level scale with a required level per skill, flags single points of knowledge and adds a development sheet that summarizes each person’s growth areas, and it is part of the IT Leadership and Team Management Toolkit with a 1:1 meeting framework, a hiring scorecard and a 90-day onboarding plan.
Chapter 6 of Effective IT Team Management covers development plans, mentoring and succession. If you are new to managing the team, see From engineer to IT manager: a plan for your first 90 days.
Sources: Al Alousi, Effective IT Team Management, chapter 6; Al Alousi, Modern IT Infrastructure and Operations, chapter 1. The team in the example is hypothetical.
Short answer: Maximum tolerable downtime (MTD) is how long a business process can be disrupted before the harm becomes unacceptable. It is a business decision. The recovery time objective (RTO) is how long the systems behind that process can take to recover, and it must be shorter than the MTD. The recovery point objective (RPO) is how far back in time you can afford to lose data, and it sets how often you back up or replicate.
These three numbers drive most of the cost of a disaster recovery design, so it pays to get them right before buying anything. Set them too loose and the plan fails the business. Set them too tight and you pay for recovery speed nobody needed.
NIST SP 800-34, the US federal contingency planning guide, defines all three. The table puts its definitions next to who owns each number and what it drives.
| Term | NIST definition (SP 800-34 Rev. 1) | Who sets it | What it drives |
|---|---|---|---|
| MTD | “The amount of time mission/business process can be disrupted without causing significant harm to the organization’s mission” (glossary) | The business owner of the process | The upper limit for every recovery target below it |
| RTO | “The overall length of time an information system’s components can be in the recovery phase before negatively impacting the organization’s mission or mission/business processes” (glossary) | IT, within the limit set by the MTD | Recovery architecture: standby sites, failover, staffing |
| RPO | “The point in time to which data must be recovered after an outage” (glossary) | The business owner, with IT advising on cost | Backup frequency and replication design |
MTD describes a business process, such as taking orders. RTO and RPO describe the systems that support it. One process can depend on several systems, and each needs targets that fit inside the process’s MTD.
Take a hypothetical online order system. The sales director agrees that losing orders for more than 8 hours would do serious harm, so the MTD is 8 hours.
The RTO cannot simply be 8 hours. Recovery time is not only the restore itself. Somebody has to notice the outage, decide to invoke the recovery plan and then check that the restored system works. If detection and the decision take up to 1 hour and validation takes 1 hour, a 4-hour restore gives a total of 6 hours, leaving 2 hours of margin inside the MTD.
The book defines the RTO as the maximum time before the service must be back in operation, which counts the whole 6 hours. NIST’s definition counts only the time spent in the recovery phase, which here is the 4-hour restore. Both uses are common, so write down which one your targets mean. If you use the end-to-end figure, the RTO is 6 hours and the restore has a 4-hour budget inside it.
Now the RPO. If the order database is backed up once a night at 01:00 and fails at 23:00 the same day, the newest backup is 22 hours old. Every order taken in those 22 hours is gone unless it can be rebuilt from somewhere else. If the business says it can lose at most 15 minutes of orders, nightly backups cannot meet that. You need replication or log backups at least every 15 minutes, and that decision has a price the business should see.
Ask a business leader how much downtime they can tolerate and the answer is usually “none”. Chapter 12 of Modern IT Infrastructure and Operations suggests a better question: what is the financial impact of being down for 4 hours compared with 24 hours? Moving the conversation from tolerance to cost makes people rank their systems, because they can see that a near-zero RTO is a spending decision.
A short business impact analysis then records the answers. The book gives a sample matrix along these lines:
| Function | MTD | RTO | RPO | Owner |
|---|---|---|---|---|
| Email and communication | 8 hours | 2 hours | 15 minutes | IT operations |
| ERP and finance | 24 hours | 4 hours | 30 minutes | Finance IT lead |
| CRM | 48 hours | 6 hours | 1 hour | Sales director |
| Data warehouse | 72 hours | 8 hours | 4 hours | Data team |
Every RTO in the sample is well inside its MTD, and every row has a named owner. Both are worth copying. A target without an owner is a guess.
The RTO narrows the choice of recovery design. The book describes the usual options this way:
A 4-hour RTO rules out a cold site. A 15-minute RTO usually rules out anything that needs a person to start the restore by hand.
The Disaster Recovery Plan Template has sections for recovery objectives by tier, roles, invoking the plan, recovery order, a runbook for each system, failback and testing. The business impact analysis summary sits in the Business Continuity Plan in the same toolkit. To put a cost on downtime before you agree the targets, use the Downtime Cost Calculator. Both are in the Resilience and DR Toolkit along with tabletop exercise scenarios and a DR readiness assessment.
Chapter 12 of Modern IT Infrastructure and Operations covers business continuity, disaster recovery and resilience planning in depth. For converting availability targets into minutes of downtime, see 99.9% vs 99.99% availability. For one practical lesson a week, join the newsletter.
Sources: NIST SP 800-34 Rev. 1 definitions via the NIST glossary (MTD, RTO, RPO). Al Alousi, Modern IT Infrastructure and Operations, chapter 12. The order system is a hypothetical example.
Short answer: A standard change is low risk, repeatable and pre-approved, so it runs from a documented procedure without a meeting. A normal change is assessed for risk and approved before it runs, by a change advisory board (CAB) or a delegated approver depending on the risk. An emergency change is needed now to stop or prevent serious harm, gets a fast approval from a small group, and is reviewed afterwards. If nothing is being lost and nothing serious is about to happen, it is not an emergency.
Change classification sounds like paperwork. It is really a way to spend review effort where the risk is. Google’s Site Reliability Engineering book reports that roughly 70% of outages are due to changes in a live system (Introduction). Treat every change the same and you either slow routine work to a crawl or wave risky work through. Three categories, used honestly, avoid both.
| Type | Risk | Approval | Typical lead time | Examples |
|---|---|---|---|---|
| Standard | Low, well understood | Pre-approved once; each run is logged | None beyond the schedule | Routine patching from a tested baseline, adding a user to a standard group, replacing a failed drive in a redundant array |
| Normal | Low to high, assessed each time | Delegated approver for low risk; CAB for medium and high | Days, set by your CAB cycle | Firewall rule changes, a database upgrade, a new monitoring agent on production servers |
| Emergency | Usually high, but delay is worse | Small emergency group, by phone or chat | Minutes to hours | A fix for an active P1, an urgent security patch for a vulnerability being exploited |
The examples are typical, not automatic. Patching a critical database cluster may well be a normal change even where desktop patching is standard.
A standard change is the reward for doing something safely and predictably. Before you approve one, check that:
Keep a list of approved standard changes, and remove an item from the list if it causes an incident until the procedure has been fixed. A healthy change process moves routine work into the standard list over time, which frees the CAB to look at changes that need attention.
For normal changes, a quick risk score decides who approves. Rate impact and likelihood from 1 to 3 and multiply them.
| Rating | Impact if it goes wrong | Likelihood it goes wrong |
|---|---|---|
| 1 | One non-critical service, few users, outside business hours | Done many times before, tested in a non-production environment, rollback under 15 minutes |
| 2 | One critical service or a whole team, or during business hours | Done before but not recently, partly tested, or rollback takes up to an hour |
| 3 | Several critical services, customers or a whole site | First time, untested, many dependencies, rollback over an hour, or no clean rollback |
The product can only be 1, 2, 3, 4, 6 or 9. A practical mapping:
Two rules make the score more useful than the arithmetic suggests. First, the person raising the change scores it and the approver checks the score, so nobody marks their own work low risk without a second look. Second, record the score. After a few months you can compare scores with which changes actually failed and adjust the criteria.
Chapter 11 of Modern IT Infrastructure and Operations gives a blunt test for CAB meetings: when someone says a change is quick and nothing should go wrong, ask exactly how it will be undone, and decline the change if the engineer cannot explain how to roll it back in under fifteen minutes. “Should” is not a plan. A rollback that has never been rehearsed belongs in the likelihood score.
The emergency path exists so that a fix for an active outage is not stuck waiting for next Tuesday’s CAB. It is also the easiest path to abuse. The same chapter of the book draws the line clearly: an emergency is when the business is losing money or data now. A missed submission deadline is not an emergency; it waits for the next cycle. If late planning can use the emergency route, the emergency route soon becomes the normal one.
Three habits keep it honest:
The Change Risk Assessment Matrix takes the same idea further: it scores each change on several risk factors, turns the total into an approval route, and rates any change with no possible rollback, or a data change that cannot be reversed, as at least high risk. It is part of the Change Management Toolkit, which also includes a CAB meeting pack, a rollback plan template and a change calendar. To start with something free, download the change request form.
Chapter 11 of Modern IT Infrastructure and Operations covers the three change categories, CAB responsibilities and how change connects to incident and problem management. For setting incident priority, see Incident priority matrix: how to set P1 to P4.
Sources: Google, Site Reliability Engineering, Introduction. DORA, DORA metrics. Al Alousi, Modern IT Infrastructure and Operations, chapter 11. The scoring scheme is an example to adapt.
Short answer: Set incident priority from two questions: how much of the business is affected (impact) and how fast the damage grows (urgency). Put them in a three by three grid that returns P1 to P4, and give each priority a response target and a restore target. Write the definitions in business terms, so whoever takes the call at 3 a.m. can decide in under a minute.
Many teams have priority levels. Fewer have levels that two people would apply the same way. When the definitions are vague, priority ends up depending on who reported the problem and how loudly. A matrix fixes that by turning a judgment call into two smaller questions with written answers.
A failed disk in a redundant array is technically serious and has no effect on users today. A report that fails to export on payroll day is technically trivial and has a hard deadline in a few hours. If you rank incidents by how broken the technology is, the second one waits behind the first. Priority has to describe the effect on the business, which is why the two inputs are impact and urgency rather than “how bad is the error”.
Impact is the size of the effect right now. Three levels are enough for most teams. Use criteria people can check quickly.
| Impact | Typical criteria |
|---|---|
| High | A critical service is down or unusable, most users or a whole site are affected, or customers can see the problem. |
| Medium | A service is degraded, or one team or department cannot work normally, and a workaround is limited or slow. |
| Low | One user or a small group is affected, a non-critical function is broken, or a reasonable workaround exists. |
Keep a list of which services count as critical. Without it, every service owner will argue that theirs is.
Urgency is how quickly the impact gets worse or becomes expensive. It answers “what happens if we wait?”
| Urgency | Typical criteria |
|---|---|
| High | Damage is growing now: lost revenue, data at risk, a safety or legal deadline, or a fixed business deadline within hours. |
| Medium | Work is slowed and will become costly if it lasts into the next business day. |
| Low | The problem can wait for normal scheduling without real harm. |
Each cell gives one priority. The pattern below is adapted from the sample incident priority matrix in chapter 11 of Modern IT Infrastructure and Operations.
| Impact / Urgency | Low urgency | Medium urgency | High urgency |
|---|---|---|---|
| High impact | P2 | P1 | P1 |
| Medium impact | P3 | P2 | P2 |
| Low impact | P4 | P3 | P3 |
Notice that low impact never becomes P1, however urgent the reporter feels it is, and high impact never drops below P2. Those two rules alone remove most priority arguments.
A priority only matters if it changes what happens next. Give each level two targets: respond (a qualified person has acknowledged the incident and started work) and restore (users can work again, even if through a workaround). Finding the root cause belongs to problem management and is tracked separately, so it does not hold the incident open.
| Priority | Respond within | Restore within | Who is engaged |
|---|---|---|---|
| P1 | 15 minutes | 4 hours | On-call engineer paged, incident lead named, stakeholder updates on a fixed schedule |
| P2 | 30 minutes | 8 hours | On-call engineer paged, service owner informed |
| P3 | 4 business hours | 3 business days | Resolver team queue |
| P4 | 1 business day | 5 business days | Resolver team queue, scheduled work |
P1 and P2 targets run on the clock, around the clock. P3 and P4 run in business hours, so a P3 logged late on Friday is not overdue by Monday morning. These numbers are examples, not a standard. Use the targets in your own service level agreements, and check that your staffing can meet them. A 15-minute response at night needs someone on call with paging, not an inbox. The book’s sample goes one step further and sets targets per cell, so a high impact, high urgency incident gets a faster target than a high impact, medium urgency one. That is worth doing once the basic scheme is working.
If your team already uses “Sev 1 to Sev 4” instead of “P1 to P4”, keep the names you have. What matters is one scheme, used the same way by everyone, and written down.
Some P1s need more than a fast fix. They need coordination: several teams, regular updates and one person in charge. Google’s Site Reliability Engineering book suggests declaring an incident if any of these is true: a second team is needed to fix it, customers can see the outage, or the issue is still unsolved after an hour of focused analysis. It also recommends declaring early, because closing a small incident is cheaper than starting the process hours into a growing one (Managing Incidents).
The same chapter separates four roles: an incident commander who tracks the overall state and assigns work, an operations lead whose group is the only one changing the system, a communications lead who sends updates, and a planning role for longer-running tasks and handoffs. Even on a small team, naming the first three stops the common failure where everyone is debugging and nobody is talking to the business.
The Severity Classification Matrix is an editable workbook with impact and urgency definitions, the priority matrix, response, update and resolution targets, and a sheet that classifies an incident from two answers. It is also part of the Incident Management Toolkit, which adds a major incident runbook, communication templates and a post-incident review pack.
Chapter 11 of Modern IT Infrastructure and Operations covers incident, problem and change management, including the sample priority matrix this guide adapts. If you are setting the targets that go into a service agreement, see SLA vs OLA vs SLO.
Sources: Google, Site Reliability Engineering, chapter 14, Managing Incidents. Al Alousi, Modern IT Infrastructure and Operations, chapter 11. Example targets are illustrations to adapt, not a standard.
Short answer: 99.9% availability allows about 8.76 hours of downtime a year, or 43.2 minutes in a 30-day month. 99.99% allows about 52.56 minutes a year, or 4.32 minutes a month. Each extra nine cuts the allowance by a factor of ten.
An availability target sounds like a quality grade. It is really a budget of downtime, and it helps to know how small that budget is before you promise it to anyone.
These figures assume a 365-day year and a 30-day month, and count every minute of the year.
| Availability | Downtime per year | Downtime per 30-day month |
|---|---|---|
| 99% | 87.6 hours | 7.2 hours |
| 99.9% | 8.76 hours | 43.2 minutes |
| 99.95% | 4.38 hours | 21.6 minutes |
| 99.99% | 52.56 minutes | 4.32 minutes |
| 99.999% | about 5 minutes 15 seconds | about 26 seconds |
The arithmetic is simple: multiply the unavailable fraction by the length of the period. For 99.99%, that is 0.0001 × 525,600 minutes in a year, which gives 52.56 minutes. Google’s Site Reliability Engineering book uses the same figure for a 99.99% target (Embracing Risk).
Everything comes out of the same allowance: planned maintenance, a bad deployment, a failure in a service you depend on, and the incident nobody has had yet. At 99.99%, a single 45-minute maintenance window uses about 86% of the year’s budget before anything has actually broken.
If a request passes through two components in series, each available 99.9% of the time with independent failures, the path is available about 99.8% of the time (0.999 × 0.999 = 0.998). Every dependency you add in series draws from the same budget.
Two independent 99.9% components in parallel, where either one can serve, are both down only 0.1% of 0.1% of the time. That is 99.9999% on paper. In practice, shared power, a shared network path, shared configuration or one deployment pipeline can take both down together, and the real figure is far lower.
Counting minutes of downtime is the familiar method. For widely distributed services, Google’s SRE book notes that a time-based measure is usually not meaningful, because some traffic is nearly always being served somewhere. It measures the share of requests that succeed instead: a system serving 2.5 million requests a day with a 99.99% daily target can return up to 250 errors and still meet it (Embracing Risk).
Whichever measure you use, say which one it is. “99.9% available” means different things depending on whether you count minutes, requests or only unplanned outages.
If the honest list does not fit the budget, change the target or the design before the number goes into a contract, a dashboard or a slide.
Chapter 12 of Modern IT Infrastructure and Operations covers business continuity, disaster recovery and resilience planning, and its glossary gives the same rule of thumb for 99.9% and 99.99%.
Sources: Google, Site Reliability Engineering, chapter 3, Embracing Risk. All other figures are calculated from the assumptions stated above.